Skip to content

Network | DOCSIS | Maximum Capacity Reached

Symptoms

Probable Causes

The currently reserved capacity on the upstream channel already exceeds its virtual reservation capacity, based on the configured subscription level limit. Increasing the subscription level limit on the current upstream channel will place you at risk of being unable to guarantee the individual reserved rates for modems since this upstream channel is already oversubscribed.

Load-balance the modems that are requesting the reserved upstream rate on another upstream channel.

Variables

Variable Description Default
interface Cable interface
upstream Upstream
cur_bps Current bps reservation
res_bps Reserved bps

Events

Opening Events

Network | DOCSIS | Maximum Capacity Reached may be raised by events

Event Class Description
Network | DOCSIS | Maximum Capacity Reached dispose